An FTTH installation completion-report checklist
A useful FTTH completion report lets the office understand what happened at the property and lets the contracting company review the work without piecing together messages from several people. Use this operational checklist to organize evidence before a job is submitted. It does not replace the network operator’s technical acceptance rules, safety procedures or contract requirements.
1. Confirm the job and the visit
Start with the correct work order and customer record. Check the installation address, the assigned contractor and project, the visit date and the crew responsible for the work. An otherwise complete report is difficult to reconcile when it is attached to the wrong customer identifier or project. Where the contractor supplies an external reference, preserve it in the customer record used for the order.
Record the result of the visit honestly. An installation that could not proceed should remain distinguishable from one that was completed. If the customer was unavailable, infrastructure was missing or another visit is required, use the appropriate blocked or follow-up workflow. Do not mark an unsuccessful visit as completed merely to remove it from the day’s schedule.
- Correct customer and installation address
- Work-order number, project and contracting company
- Assigned crew and visit result
2. Complete the installation form with observed information
AdminFiber’s installation form can record building type, in-house cabling, laying method, ONT details and the installation result. Fill these fields from what the technician observed, following the contracting company’s terminology. Avoid copying information from a previous job unless it has been checked for this property. Repair work has a separate set of questions for the reported problem, root cause, fault location and action taken.
The ONT serial number and power, PON and alarm-lamp states help the office understand the recorded equipment and its state at handover. A lamp state is evidence, not a substitute for the operator’s required tests. If signal measurements, instrument exports or another document are required by your contract, confirm how those records must be supplied. Do not invent a passing threshold or assume the application certifies the installation.
- Required building and cabling fields
- ONT serial and observed lamp states
- Installation outcome, or repair findings when applicable
3. Capture photos that make the work understandable
Organize photos by what the reviewer needs to inspect. AdminFiber’s completion workflow includes categories such as fiber entry, cable route, ONT and signal test. Check that a photo is clear enough to identify its subject and belongs to the current property. A large number of unrelated pictures is less useful than a small set that answers the contractor’s acceptance questions.
Take only the pictures needed for the job and your agreed documentation process. Avoid including unrelated people, private documents, access credentials or household details. Before sharing a report or sending additional evidence, check which information the recipient needs and is authorized to receive. Follow your company’s instructions for notice, access and retention rather than treating a photo upload as permission for unrestricted distribution.
- Relevant photo categories completed
- Images checked for clarity and correct property
- Unnecessary personal information excluded
4. Reconcile the materials issued for this order
Before submitting, compare the material handed to the technician with what was used, returned and damaged. Use the correct units: cable measured in meters is different from an ONT counted as a piece. AdminFiber requires these reported quantities to balance with the issued material before the job can be submitted. Resolve discrepancies while the crew can still explain them.
Keep equipment documentation and stock administration aligned through your depot process. AdminFiber stores serial-tracked inventory and the ONT serial entered in the completion form, but does not automatically match the two. If your operator requires a particular serial number to be associated with a particular address, include an explicit check in the office or depot handover. Do not assume recording a serial in one place updates every other record.
- Used, returned and damaged quantities balance
- Material units are correct
- Required equipment serial association checked
5. Submit for review, then resolve missing evidence
Where a customer signature is required by your company’s process, obtain it on the technician’s screen after the relevant information is ready. Explain what the customer is acknowledging. A signature should not be used to disguise incomplete work or to claim acceptance of requirements that were never presented.
Submitting a job in AdminFiber locks it for the crew and puts it into office review. The reviewer checks the form, materials and photos before approval, or reopens the job when corrections are needed. Use reopening to make missing information visible to the technician. Office changes to completion information are recorded in the audit log, supporting a clearer correction history.
- Signature collected where required
- Completion evidence submitted for office review
- Missing information corrected before approval
6. Hand over the right report
After review, select the contractor, project and date range that match the requested handover. Check the resulting report rather than assuming the filter was correct. AdminFiber provides contractor reports, exports and shared-report links; a summary report and the underlying completion evidence are different things, so confirm which one your contracting company needs.
Use this checklist as a repeatable office-to-field handover. Adapt it to the actual job type, operator instructions and contract, and remove any step that does not apply. A consistent report is useful because it is accurate and reviewable, not because every possible field has been filled with a default answer.